Well, the builders have now left us, and there’s just the final fittings and decorating to do. One week to go before we re-open and then everyone will be able to see for themselves what we’ve been up to for the past few weeks. No insurmountable problems were experienced, and thanks must go to everyone [...]
Archive for August, 2008
Posted on August 30th, 2008 in News
Tags:
Read post
Comments Off
Posted on August 10th, 2008 in News
Two weeks of hard work and we now have all the new ‘rooms’ built, walls plastered, some with tiles on, doors hung, paint chosen new electrics thread through. The broken drain has been found and will be repaired, and the boiler drain has been relocated inside correctly. On the downside the loft is a mess, [...]
Tags:
Read post
Comments Off
Posted on August 01st, 2008 in News
As the first week of the refurbishment draws to a close and the dust begins to settle (literally!) we are starting to see the new layout of our toilets. In fact, the layout is very new, as in taking down the original walls we were able to see where improvements to our proposed design could [...]
Tags:
Read post
Comments Off